RAIHAN, Muhammad; SIDABALOK, Abdul Syahputra. Design and Build Project Scheduling Applications Using the Critical Path Method. Bigint Computing Journal, [S. l.], v. 3, n. 2, p. 91–99, 2025. DOI: 10.55537/bigint.v3i2.1255. Disponível em: https://journal.aira.or.id/index.php/bigint/article/view/1255. Acesso em: 24 aug. 2025.