Time Management Analysis of Administrative Implementation in the North Sumatra Provincial Forestry Service Using the CPM Method
DOI:
https://doi.org/10.55537/jibm.v2i2.233Keywords:
Practical Work (KP), Administration, Critical Path Methode (CPM)Abstract
Practical work (KP) is an academic activity that is oriented towards forms of student learning to develop and improve a quality workforce. By participating in practical work (KP) it is hoped that students will be able to add knowledge, skills and experience in preparing themselves to enter the real world of work. The problems that occur in the administration section are delays in the administrative process. So instead of practicing, try to use the CPM method to complete the administrative process to make it more efficient. The critical path can be found by looking at the total float resulting in a sum equal to 0 which is a critical activity and the critical path is found as follows: "1-3-4".
Downloads
References
A, A. H. (2005). Perencanaan Dan Pengendalian Proyek Dengan Metode Pert – Cpm: Studi Kasus Fly Over Ahmad Yani, Karawang. Journal The Winners 6 (2), 159-160.
Asri, D. F., Setiawan, T. H., & Rusdiana, Y. (2020). Analisis Jaringan Kerja Pada Evaluasi Penjadwalan Waktu Dan Biaya Penyelesaian Proyek Dengan Menggunakan Metode Pert & Cpm. Jurnal Saintika Unpam 2 (2), 136-138.
Aulady, M. F. N., & Orleans, C. (2018). Perbandingan Durasi Waktu Proyek Konstruksi antara Metode Critical Path Method (CPM) dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartamen Menara Rungkut). Jurnal Iptek, Vol. 20, No. 1, P. 13, Apr.
Hermanto, dkk. (2017). Analisa Network Planning dengan Critical Path Method Pada Proyek Uninteratuble Power Supply 80 kva pada PT Harmon Mitra Sukses (Studi Kasus RSAB Harapan Kita, Jakarta). Jurnal Teknik Universitas Muhammadiyah Tangerang, Vol. 06, No. 01.
Nalhadi, A., & Suntana, N. (2018). Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (Cpm). J. Sist. Dan Manaj. Ind., Vol. 1, No. 1, P. 35.
Perdana, S., & Rahman, A. (2019). Penerapan Manajemen Proyek Dengan Metode Cpm (Critical Path Method) Pada Proyek Pembangunan SPBE,” Amaliah Jurnal Pengabdian Kepada Masyarakat, Vol. 3, No. 1, Pp. 242–250.
Purhariani, Y. (2017). Penerapan CPM (Critical Path Method) dalam Pembangunan Rumah (Studi Kasus Pembangunan Rumah Tipe 36 Ukuran 6 M X 6 M di Jalan Balowerti Nomor 37 Kecamatan Kota Kota Kediri). Simki-Economic. Vol. 01, No. 03.
Ratminto Dan Winarsih. (2005). Manajemen Pelayanan. Yogyakarta: Pustaka Pelajar.
Risnawati. (2014). Optimalisasi Pelaksanaan Proyek Dengan Metode Evaluasi Dan Review Proyek (Pert) Dan Critical Path Method (CPM). Jurnal MSA 3 (2), 57-58.
Stefanus, Y. (2017). Analisis Percepatan Waktu Penyelesaian Proyek Menggunakan Metode Fast- Track dan Crash Program. Jurnal Media Teknik Sipil, Vol. 15, No. 1.
Sugiono. (2012). Metode Penelitian Kuantitatif Kualitatifdan R&D. Bandung: Alfabeta.
Walangitan, R., & Tjakra, J. (2017). Sistem Pengendalian Waktu Dengan Critical Path Method (CPM) Pada Proyek Kontruksi (Studi Kasus: Menara Alfa Omega Tomohon). Jurnal Sipil Statik. Vol. 5, No. 6, hal: 363-371.
Wardani, N. M., Musdalifah, S., & Lusiyanti, D. (2018). Optimalisasi Biaya Dan Waktu Pelaksanaan Proyek Pembangunan Perumahan Citraland Palu Menggunakan Metode Program Evaluation And Review Technique (Pert) – Critical Path Method (Cpm). Jurnal Ilmiah Matematika Dan Terapan 15 (2), 205-207.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Elpita Sari Hasibuan, Evi Borliana Siregar, Fikri Husin Batubara, Muhammad Vikry Rezky Rambe, Riri Syafitri Lubis

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.